Our air quality engineering and permitting staff has experience with State and Federal regulatory requirements for oil and gas production facilities and ancillary equipment as required by the Wyoming Air Quality Standards and Regulations, Air Quality Division (WAQSR/AQD) Chapter 6, Section 2 Oil and Gas Production Facilities Permitting Guidance.

GGA has the skills and contacts to prepare construction permit applications for oil and gas production facilities, compressor, generator and pumping unit engines.  We maintain working relationships with flow measurement companies and laboratories capable of providing the information necessary for both quantifying and qualifying regulated air pollutant emissions that must be included in air quality permit applications. We can evaluate and compile air emission inventories required by the Wyoming Department of Environmental Quality – Air Quality Division (WDEQ/AQD).  We regularly perform air quality compliance auditing and prepare reports and notifications required under air quality permits.

Production Facility Permitting Services


  • Single Wells
  • PAD Facilities
  • Multiple Wells
  • Central Tank Batteries
  • Natural Gas and Diesel Engines
  • Commercial and Non-Commercial Produced Water Handling Facilities

NOTE: the WAQSR/AQD is currently developing guidance for the permitting of new and existing pits and ponds and Oilfield Waste Disposal (OWD) Facilities. Draft guidance was issued in October 2020. Once finalized, we will be able to prepare permits for these facilities.

WDEQ/AQD Air Quality Inventories


  • Triennial
  • Annual
  • Upper Green River Basin Winter